• [email protected]
  • +95 9 513 4901
  • Room No.101, Aung Myay Pyae Sone Condominium, 50th Street, Botahtaung Township, Yangon

Design of 15,000 DWT Multi-purpose Terminal at Ahlone Foreshore Area

Project : Design of 15,000 DWT Multi-purpose Terminal at Ahlone Foreshore Area
Client : Nawng Tung Co., Ltd
Project Location : Ahlone Foreshore Area Yangon, AIPT (2) Area
Project Description : It is such a huge project which is designed to handle 235,000 TEUs annually. It is strategically located in Ahlone Foreshore Area, Downtown Yangon. Our client wants to build a mega container port which will be in competition to existing ports in that area. The container terminal includes almost all of the container facilities laden and empty container slots, refer container yard, container freights station CFS, transit shed, port administration office and related buildings, container repair area and storage for dangerous cargo as well. Total around 200 drawings those include all port infrastructure and buildings’ architectural and structural. According to business portfolio by the client, this port construction was not proceed, however it will be started again soon.